Contract:
Safety Integrity Level (SIL) Determination and Verification
Plant: Petrochemical Plant
Case Study: Retrospective S.I.L. assessment was required on a large section of an existing petrochemical plant.Following the HAZOP report a S.I.L. determination was undertaken for all Safety Instrumented Functions (SIF). to establish a target S.I.L. for each function.Using the very latest software available whi...
READ MORE >
Copyright 2010 ProSalus Ltd,
All rights reserved.
Design & Development by 9xb